yitit
Home
/
Hardware
/
Intel Client & Server CPU Roadmap Updates: Meteor Lake In 2023, 20A & 18A Powered Xeons & Core Chips Beyond 2024
Intel Client & Server CPU Roadmap Updates: Meteor Lake In 2023, 20A & 18A Powered Xeons & Core Chips Beyond 2024-February 2024
Feb 12, 2026 6:09 PM

In addition to its graphics update, Intel also announced its new client and server CPU roadmap which encompasses its Core and Xeon chips.

Intel Client 'Core' & Server 'Xeon' CPU Roadmap Unveiled: 5nm Manufacturing In 2H 2022, 3nm In 2H 2023, 20A In 1H 2024 & 18A In 2H 2024

The latest Technology roadmaps and milestones shown by Intel give a rundown of their upcoming products from the Client and Server divisions. Intel states that they are on track to reclaim the perf per watt leadership by 2025 and have shown a range of products that will help them achieve this ambitious goal.

Intel remains on track to reclaim transistor performance per watt leadership by 2025. Intel’s advanced test and packaging technologies give it unmatched industry leadership that benefits its products and foundry customers and will play a critical part in the pursuit of Moore’s Law. Continuous innovation is the cornerstone of Moore’s Law, and innovation is very much alive and well at Intel.

via Intel

Process–Intel 7 is in production and shipping in volume with the launch of 12th Gen Intel® Core™ processors and additional products coming in 2022. Intel 4, our implementation of extreme ultraviolet (EUV) lithography, will be manufacturing-ready in the second half of 2022. It delivers an approximate 20% increase in transistor performance per watt. Intel 3, with additional features, delivers a further 18% performance per watt and will be manufacturing-ready in the second half of 2023. Ushering in the Angstrom Era with RibbonFET and PowerVia, Intel 20A will deliver up to a 15% performance per watt improvement and will be manufacturing-ready in the first half of 2024. Intel 18A delivers an additional 10% improvement and will be manufacturing-ready in the second half of 2024.PackagingOuradvanced packaging leadership gives designers options across thermals, power, high-speed signaling, and interconnect density, to maximize and co-optimize product performance. In 2022, Intel will ship leadership packaging technologies in Sapphire Rapids and Ponte Vecchio and start risk production on Meteor Lake. Foveros Omni and Foveros Direct, our advanced packaging technologies unveiled at Intel Acceleratedin July 2021, will be manufacturing-ready in 2023.InnovationAs Intel looks forward to technologies such as High-NA EUV, RibbonFET, PowerVia, and Foveros Omni and Direct, its leaders see no end to innovation and therefore no end to Moore’s Law. Intel remains undeterred in achieving its aspiration of delivering approximately 1 trillion transistors in a single device by the end of the decade.2022-02-17_22-20-07

2022-02-17_22-20-12

2022-02-17_22-20-14

2022-02-17_22-20-16

2022-02-17_22-20-18

2022-02-17_22-20-20

2022-02-17_22-20-21

2022-02-17_22-20-23

2022-02-17_22-20-25

2022-02-17_22-20-27

2022-02-17_22-20-29

2022-02-17_22-20-34

2022-02-17_22-20-35

2022-02-17_22-20-37

2022-02-17_22-20-42

2 of 9

Intel Process Roadmap

Process NameIntel 10nm SuperFinIntel 7Intel 4Intel 3Intel 20AIntel 18A
ProductionIn High-Volume (Now)In Volume (Now)2H 20222H 20232H 20242H 2025
Perf/Watt (over 10nm ESF)N/A10-15%20%18%>20%?TBA
EUVN/AN/AYesYesYesHigh-NA EUV
Transistor ArchitectureFinFETOptimized FinFETOptimized FinFETOptimized FinFETRibbonFETOptimized RibbonFET
ProductsTiger LakeAlder Lake
Raptor Lake
Sapphire Rapids
Emerald Rapids
Xe-HPG?
Meteor Lake
Xe-HPC / Xe-HP?
Granite Rapids
Sierra Forest
TBA
Arrow Lake
Diamond Rapids?
TBA
Lunar Lake
Nova Lake
TBA
TBA

Intel Client CPU Roadmap

Starting with the Intel Client CPU roadmap, the company has already launched its Alder Lake CPU lineup, and its follow-up, the 13th Gen Raptor Lake lineup is on track for launch later this year. For Raptor Lake, 24 cores and 32 threads have been confirmed (8+16). The blue team is also promising up to double-digit performance gains, enhanced overclocking support, a new AI M.2 support, and socket compatibility with the Alder Lake platform (LGA 1700/1800).

CCG Roadmap Updates– Building upon its leadership products today, Intel’s roadmap for next-generation client products includes:

Raptor Lake– Shipping in the second half of 2022, Raptor Lake will deliver up to double-digit performance increases compared with Alder Lake and come with enhanced overclocking features. Raptor Lake features up to 24 cores and 32 threads and is built on the Intel 7 process node with performance hybrid architecture. Raptor Lake will be socket-compatible with Alder Lake systems.Meteor Lake and Arrow Lake– Meteor Lake will be built on Intel 4. Arrow Lake will be the first Intel product using Intel 20A tiles, as well as tiles made using an external process. These products will offer a huge step forward on XPU improvement, with integrated AI and tiled GPU architecture that offers discrete graphics-class performance. Meteor Lake will ship in 2023, and Arrow Lake will follow in 2024.Lunar Lake and Beyond– Fueled by its IDM 2.0 strategy, Intel will be using both internal and external process nodes to deliver leadership products.

The next update to the Client CPU roadmap will come in the form of Meteor Lake which is scheduled for manufacturing on the 'Intel 4' process node in 2H 2022 and expected for launch in 2023. The 'Intel 4' node will deliver 20% performance per watt improvement and will be the first to use EUV technology, offering a significant increase in density over 'Intel 7' (10nm ESF). Intel will also be launching a follow-up to Meteor Lake in 2024 known as Arrow Lake.

Both Meteor and Arrow Lake CPUs will feature several different core IPs composed of Intel 4 (Meteor Lake), Intel 20A (Arrow Lake), and TSMC's N3 (Arc GPU / SOC) process node. What's particularly interesting is that starting Meteor Lake, the new CPUs will feature a Tiled-GPU design featuring Arc graphics architecture. Raja Koduri states that this 'tGPU' will be unlike anything previously done on client CPUs and will be different than discrete and integrated graphics designs.

Moving beyond 2024, Intel plans to offer a major overhaul to its Client platform with Lunar Lake and Nova Lake chips. These will likely be scheduled for 2025 and 2026 releases, respectively. The next-generation CPUs will come within a tiled-CPU architecture, featuring an MCM CPU, SOC, and GPU IPs integrated on the same package. Both Lunar Lake & Nova Lake chips are expected to utilize the improved 18A node which will offer an additional 10% improvement in performance per watt and add more enhancements to the RibbonFET architecture. The manufacturing is scheduled for 1H 2024 for 20A and 2H 2024 for 18A chips. Other core IPs will be relying on external foundry nodes.

As you can see from the roadmap block diagrams, the next-gen Client platforms will be utilizing a fully-integrated MCM design, making use of several chiplets that will be integrated on the same CPU package. All in all, the following is the node-specific to the chiplet count we can expect on future client chips from team blue:

4 - 3 Chiplet SOC20A - 4 Chiplet SOC18A - 5 Chiplet SOC

Intel Mainstream CPU Generations Comparison:

Intel CPU FamilyProcessor ProcessProcessor ArchitectureGraphics ArchitectureProcessors Cores/Threads (Max)TDPsPlatform ChipsetPlatformMemory SupportPCIe SupportLaunch
Sandy Bridge (2nd Gen)32nmSandy BridgeHD30004/835-95W6-SeriesLGA 1155DDR3PCIe Gen 2.02011
Ivy Bridge (3rd Gen)22nmIvy BridgeHD40004/835-77W7-SeriesLGA 1155DDR3PCIe Gen 3.02012
Haswell (4th Gen)22nmHaswellHD46004/835-84W8-SeriesLGA 1150DDR3PCIe Gen 3.02013-2014
Broadwell (5th Gen)14nmBroadwellIris Pro 62004/865-65W9-SeriesLGA 1150DDR3PCIe Gen 3.02015
Skylake (6th Gen)14nmSkylakeHD 500 Series4/835-91W100-SeriesLGA 1151DDR4PCIe Gen 3.02015
Kaby Lake (7th Gen)14nmSkylakeHD 600 Series4/835-91W200-SeriesLGA 1151DDR4PCIe Gen 3.02017
Coffee Lake (8th Gen)14nmSkylakeHD 600 Series6/1235-95W300-SeriesLGA 1151DDR4PCIe Gen 3.02017
Coffee Lake (9th Gen)14nmSkylakeHD 600 Series8/1635-95W300-SeriesLGA 1151DDR4PCIe Gen 3.02018
Comet Lake (10th Gen)14nmSkylakeHD 600 Series10/2035-125W400-SeriesLGA 1200DDR4PCIe Gen 3.02020
Rocket Lake (11th Gen)14nmCypress CoveHD 700 Series8/1635-125W500-SeriesLGA 1200DDR4PCIe Gen 4.02021
Alder Lake (12th Gen)Intel 7Golden Cove (P-Core)
Gracemont (E-Core)
HD 700 Series16/2435-125W600 SeriesLGA 1700/1800DDR5 / DDR4PCIe Gen 5.02021
Raptor Lake (13th Gen)Intel 7Raptor Cove (P-Core)
Gracemont (E-Core)
HD 700 Series24/3235-125W700-SeriesLGA 1700/1800DDR5 / DDR4PCIe Gen 5.02022
Raptor Lake Refresh (TBA)Intel 7Raptor Cove (P-Core)
Gracemont (E-Core)
HD 700 Series24/3235-125W700-SeriesLGA 1700/1800DDR5 / DDR4PCIe Gen 5.02023
Meteor LakeIntel 4Redwood Cove (P-Core)
Crestmont (E-Core)
Xe1 (Alchemist)22/2835-65W800 SeriesLGA 1851DDR5PCIe Gen 5.02024
Arrow LakeIntel 20ALion Cove (P-Core)
Skymont (E-Core)
Xe1 (Alchemist)24/32TBA800 SeriesLGA 1851DDR5PCIe Gen 5.02024
Arrow Lake Refresh (TBA)Intel 20ALion Cove (P-Core)
Skymont (E-Core)
Xe1 (Alchemist)TBATBA800 SeriesLGA 1851DDR5PCIe Gen 5.02025
Lunar LakeIntel 18ATBDXe2 (Battlemage)TBATBA900-Series?LGA 1851??DDR5PCIe Gen 5.0?2025
Panther Lake (TBA)TBATBDXe3 (Celestial)TBDTBD900-Series?LGA 1851?DDR5PCIe Gen 6.0?2026
Nova Lake (TBA)Intel 18ATBDTBATBATBA1000-Series?TBADDR5?PCIe Gen 6.0?2026

Comments
Welcome to yitit comments! Please keep conversations courteous and on-topic. To fosterproductive and respectful conversations, you may see comments from our Community Managers.
Sign up to post
Sort by
Login to display more comments
Hardware
Recent News
Copyright 2023-2026 - www.yitit.com All Rights Reserved